Hasanoğlan Cement Factory - 2500 Ton/Day Capacity Clinker Production Line
Place | ANKARA / TURKEY | ||
Customer | ÇİMPOR YİBİTAŞ | ||
Services | Multi - Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services) | ||
Design Type | Basic Design, Detail Design | ||
Contract Date | 18.09.2007 | ||
Completion Date | 05.09.2009 | ||
Information About the Project |
The Project is undertaken by EKON, a part of PROKON-EKON Group of Companies, as an EPC Contract covering the engineering, procurement, construction (civil, mechanical, electrical and automation works), commissioning and start up of 2500 tons/day a new greenfield clinker burning line, cement additives and cement grinding facilities project.
PROKON Mühendislik ve Müşavirlik A.Ş. has undertaken the general design, system balance, material flow diagrams and determination of the necessities about the process-mechanical-electrical subjects of the units under the scope of the project, and also provided basic and detail design in the engineering disciplines of architecture, mechanical, piping, electrical, structural steel and reinforced concrete and infrastructure.
The following structures and units are designed by PROKON:
|
Hasanoğlan Cement Factory - 2500 Ton/Day Capacity Clinker Production Line