<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Infrastructure &#8211; Prokon Engineering and Consulting Inc.</title>
	<atom:link href="https://www.prokon.com.tr/en/pc/infrastructure/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.prokon.com.tr</link>
	<description></description>
	<lastBuildDate>Wed, 14 Sep 2022 20:06:25 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>Infrastructure Works Of The Public Procurement Authority Directorate Building</title>
		<link>https://www.prokon.com.tr/en/portfolio/infrastructure-works-of-the-public-procurement-authority-directorate-building/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:26 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/infrastructure-works-of-the-public-procurement-authority-directorate-building/</guid>

					<description><![CDATA[  Place ANKARA / TURKEY Customer PUBLIC PROCUREMENT AUTHORITY Services Engineering Services Design Type Basic Design, Detail Design Contract Date 11.03.2004 Completion Date 02.04.2004 Project Manager   Cooperated Firms   Information About the Project The project covers basic design and detail design services in mechanical installation discipline.  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>ANKARA / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>PUBLIC PROCUREMENT AUTHORITY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Engineering Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>11.03.2004</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>02.04.2004</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Project Manager</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Cooperated Firms</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers basic design and detail design services in mechanical installation discipline.</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>İZMİR NATURAL GAS PIPING AND DISTRIBUTION PROJECT &#8211; Consultancy Services</title>
		<link>https://www.prokon.com.tr/en/portfolio/izmir-natural-gas-piping-and-distribution-project-consultancy-services/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:24 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/izmir-natural-gas-piping-and-distribution-project-consultancy-services/</guid>

					<description><![CDATA[Place İZMİR / TURKEY Customer İZMİR GAZ Services Engineering Services Infrastructural Design Construction Supervision Services Contract Date 01.11.2005 Completion Date 30.09.2007 Information About the Project In April 19th, 2005, Contract about Distribution System Design and As-Built Studies was signed between Prokon and İzmirgaz. Under the scope of the design studies, City Feed and Zone Regulator [&#8230;]]]></description>
										<content:encoded><![CDATA[<table border="&quot;0&quot;" width="&quot;96%&quot;" cellspacing="&quot;1&quot;" cellpadding="&quot;1&quot;">
<tbody>
<tr>
<td class="&quot;t-ra&quot;">Place</td>
<td>İZMİR / TURKEY</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Customer</td>
<td>İZMİR GAZ</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Services</td>
<td>Engineering Services<br />
Infrastructural Design<br />
Construction Supervision Services</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Contract Date</td>
<td colspan="&quot;3&quot;">01.11.2005</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Completion Date</td>
<td colspan="&quot;3&quot;">30.09.2007</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Information About the Project</td>
<td colspan="&quot;3&quot;">
<p class="&quot;MsoNormal&quot;"><span lang="&quot;TR&quot;">In April 19th, 2005, Contract about Distribution System Design and As-Built Studies was signed between Prokon and İzmirgaz.</span></p>
<p class="&quot;MsoNormal&quot;"><span lang="&quot;TR&quot;">Under the scope of the design studies, City Feed and Zone Regulator Station, 438.895 km length Steel Line and 9.025.083 km length PE Distribution Line with various diameters are design according to 30-year-projection.</span></p>
<p class="&quot;MsoNormal&quot;"><span lang="&quot;TR&quot;">As-Built studies has been completed in April, 2010.</span></p>
<p class="&quot;MsoNormal&quot;"><span lang="&quot;TR&quot;">Under the scope of the Construction Supervision Contract, signed in November 1st, 2005, 109.255,85 km length Steel Line, total of 1.211.329,7 km length of PE Line and total of 34.365 Service Lines Constructions, and also constructions of 3 RMS-A, 4 MS and 57 BR Stations has been controlled by Prokon.</span></p>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>İZMİR NATURAL GAS PIPING AND DISTRIBUTION PROJECT</title>
		<link>https://www.prokon.com.tr/en/portfolio/izmir-natural-gas-piping-and-distribution-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:24 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/izmir-natural-gas-piping-and-distribution-project/</guid>

					<description><![CDATA[  Place İZMİR / TURKEY Customer İZMİR GAZ Services Construction Supervision ServicesMulti &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)Structural Steel Engineering Design Type Basic Design, Detail Design Contract Date 30.03.2005 Completion Date 17.02.2008 Information About the Project The design, engineering and construction supervision services of İzmir License Zone Natural Gas Distribution [&#8230;]]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>İZMİR / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>İZMİR GAZ</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Construction Supervision Services<br />Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)<br />Structural Steel Engineering</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>30.03.2005</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>17.02.2008</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>
<p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; margin: 0cm 0cm 10pt; line-height: normal;&quot;><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-ansi-language: EN-US; mso-fareast-font-family: 'Times New Roman';&quot;>The design, engineering and construction supervision services of İzmir License Zone Natural Gas Distribution works were provided by PROKON Mühendislik ve Müşavirlik A.Ş.<!--?xml:namespace prefix = &quot;o&quot; ns = &quot;urn:schemas-microsoft-com:office:office&quot; /--></span></p>
<p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; margin: 0cm 0cm 10pt; line-height: normal;&quot;><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-ansi-language: EN-US; mso-fareast-font-family: 'Times New Roman';&quot;>The following services were within the scope of the project:</span></p>
<p class=&quot;MsoListParagraphCxSpFirst&quot; style=&quot;text-align: justify; margin: auto auto auto 33.85pt; text-indent: -18pt; mso-list: l4 level1 lfo1; mso-add-space: auto;&quot;><span style=&quot;font-size: 10pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>·<span style=&quot;font: 7pt 'Times New Roman';&quot;>         </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>Design and Construction Drawings preparation of all steel pipelines</span></p>
<p class=&quot;MsoListParagraph&quot; style=&quot;text-align: justify; margin: auto 0cm auto 54pt; text-indent: -18pt; mso-list: l6 level1 lfo2;&quot;><span style=&quot;font-size: 10pt; font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>ü<span style=&quot;font: 7pt 'Times New Roman';&quot;>  </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>438.895m intermediate pressure (12-19 Bar) steel distribution line (route determination, design, cathodic protection drawings preparation, preparation of materials list</span></p>
<p class=&quot;MsoListParagraphCxSpMiddle&quot; style=&quot;text-align: justify; margin: auto auto auto 36pt; text-indent: -18pt; mso-list: l1 level1 lfo3; mso-add-space: auto;&quot;><span style=&quot;font-size: 10pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>·<span style=&quot;font: 7pt 'Times New Roman';&quot;>         </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>Design and Construction Drawings preparation of all PE (Polyethylene) lines,</span></p>
<p class=&quot;MsoListParagraph&quot; style=&quot;text-align: justify; margin: auto 0cm auto 54pt; text-indent: -18pt; mso-list: l3 level1 lfo4;&quot;><span style=&quot;font-size: 10pt; font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>ü<span style=&quot;font: 7pt 'Times New Roman';&quot;>  </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>7.827.457m low pressure PE distribution line (route determination, design, cathodic protection drawings preparation, preparation of materials lists)</span></p>
<p class=&quot;MsoListParagraphCxSpMiddle&quot; style=&quot;text-align: justify; margin: auto auto auto 33.85pt; text-indent: -18pt; mso-list: l0 level1 lfo5; mso-add-space: auto;&quot;><span style=&quot;font-size: 10pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>·<span style=&quot;font: 7pt 'Times New Roman';&quot;>         </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>Design and Construction Drawings preparation of high pressure lines</span></p>
<p class=&quot;MsoListParagraph&quot; style=&quot;text-align: justify; margin: auto 0cm auto 54pt; text-indent: -18pt; mso-list: l5 level1 lfo6;&quot;><span style=&quot;font-size: 10pt; font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>ü<span style=&quot;font: 7pt 'Times New Roman';&quot;>  </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>Field works, route determination, design, ground investigation, expropriation documents preparation, cathodic protection drawings preparation of 11.703m 36”, 7.764m 32”, 40.150m 30”, 99.000m 8”-12” high pressure lines</span></p>
<p class=&quot;MsoListParagraphCxSpMiddle&quot; style=&quot;text-align: justify; margin: auto auto auto 36pt; text-indent: -18pt; mso-list: l2 level1 lfo7; mso-add-space: auto;&quot;><span style=&quot;font-size: 10pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>·<span style=&quot;font: 7pt 'Times New Roman';&quot;>         </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>Design and Construction Drawings preparation of RMS-A (12) , RMS-B (approximately 560) stations and stations for Industrial Consumptions (PI Diagrams, Mechanical, Electrical and Automation Design)</span></p>
<p class=&quot;MsoListParagraphCxSpMiddle&quot; style=&quot;text-align: justify; margin: auto auto auto 36pt; text-indent: -18pt; mso-list: l2 level1 lfo7; mso-add-space: auto;&quot;><span style=&quot;font-size: 10pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>·<span style=&quot;font: 7pt 'Times New Roman';&quot;>         </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>Preparation of Scada Specifications and Drawings</span></p>
<p class=&quot;MsoListParagraphCxSpMiddle&quot; style=&quot;text-align: justify; margin: auto auto auto 36pt; text-indent: -18pt; mso-list: l2 level1 lfo7; mso-add-space: auto;&quot;><span style=&quot;font-size: 10pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>·<span style=&quot;font: 7pt 'Times New Roman';&quot;>         </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>Supply, update and digitizing of all the maps in İzmir Licence Zone.</span></p>
<p class=&quot;MsoListParagraphCxSpMiddle&quot; style=&quot;text-align: justify; margin: auto auto auto 36pt; text-indent: -18pt; mso-list: l2 level1 lfo7; mso-add-space: auto;&quot;><span style=&quot;font-size: 10pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>·<span style=&quot;font: 7pt 'Times New Roman';&quot;>         </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-no-proof: yes;&quot;>Building surveys for houses and industrial facilities of the whole city and calculation of TAKS and KAKS values in the zoning plan.</span></p>
<p class=&quot;MsoListParagraphCxSpLast&quot; style=&quot;text-align: justify; margin: auto auto auto 36pt; text-indent: -18pt; mso-list: l2 level1 lfo7; mso-add-space: auto;&quot;><span style=&quot;font-family: Arial; font-size: xx-small;&quot;><span style=&quot;font-size: 10pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; mso-no-proof: yes;&quot;><span style=&quot;mso-list: Ignore;&quot;>·<span style=&quot;font: 7pt 'Times New Roman';&quot;>         </span></span></span><span style=&quot;font-size: 10pt; font-family: 'Arial','sans-serif'; mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-no-proof: yes;&quot;>Construction Supervision Services</span></span></p>
</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>WAFA COASTAL AREA NATURAL GAS FACILITY</title>
		<link>https://www.prokon.com.tr/en/portfolio/wafa-coastal-area-natural-gas-facility/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:24 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/wafa-coastal-area-natural-gas-facility/</guid>

					<description><![CDATA[  Place MELLITAH / LIBIA Customer GAMA INDUSTRY Services Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services) Design Type Basic Design, Detail Design Contract Date 15.05.2002 Completion Date 31.12.2004 Cooperated Firms JTS CONTRACTING COMPANY LTD.  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>MELLITAH / LIBIA</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>GAMA INDUSTRY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>15.05.2002</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>31.12.2004</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Cooperated Firms</td>
<td colspan=&quot;3&quot;>JTS CONTRACTING COMPANY LTD.</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ANKARA NATURAL GAS NEW PIPING &#038; CONNECTION LINES PROJECT</title>
		<link>https://www.prokon.com.tr/en/portfolio/ankara-natural-gas-new-piping-connection-lines-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:24 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/ankara-natural-gas-new-piping-connection-lines-project/</guid>

					<description><![CDATA[Place ANKARA / TURKEY Customer METROPOLITAN MUNICIPALITY OF ANKARA Services Construction Supervision Services Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services) Design Type Basic Design, Detail Design Contract Date 05.11.2001 Completion Date 31.12.2003 Information About the Project Design, Engineering and Construction Supervision Services for Gölbaşı Natural Gas Pressure Reducing Stations and [&#8230;]]]></description>
										<content:encoded><![CDATA[<table border="&quot;0&quot;" width="&quot;96%&quot;" cellspacing="&quot;1&quot;" cellpadding="&quot;1&quot;">
<tbody>
<tr>
<td class="&quot;t-ra&quot;">Place</td>
<td>ANKARA / TURKEY</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Customer</td>
<td>METROPOLITAN MUNICIPALITY OF ANKARA</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Services</td>
<td>Construction Supervision Services<br />
Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Contract Date</td>
<td colspan="&quot;3&quot;">05.11.2001</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Completion Date</td>
<td colspan="&quot;3&quot;">31.12.2003</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Information About the Project</td>
<td colspan="&quot;3&quot;">
<p class="&quot;MsoNormal&quot;"><span lang="&quot;EN-US&quot;">Design, Engineering and Construction Supervision Services for Gölbaşı Natural Gas Pressure Reducing Stations and Pipe Lines were provided by PROKON.<!--?xml:namespace prefix = &quot;o&quot; ns = &quot;urn:schemas-microsoft-com:office:office&quot; /--></span></p>
<p class="&quot;MsoNormal&quot;"><span lang="&quot;EN-US&quot;">The second natural gas supply point was planned with an RMS-A Type Station (Pressure Reducing and Measurement Station) near Gölbaşı considering the Urban Development and Natural Gas Consumption of Ankara in the year 2025. The capacity of the 2<sup>nd</sup> RMS station was 600.000m<sup>3</sup>/h, which was also designed as allowing a capacity increase up to 1.000.000m<sup>3</sup>/h. The Natural Gas was carried from station to Doğukent District by steel pipes. The distribution was performed by a B Type RMS Station with a capacity of 250.000m<sup>3</sup>/h on that district. The total pipeline length was approximately 50 km. The gas pressure on RMS-A station outlets were considered to be 40 Bar, rather than 19-20 Bar Operation Pressure. Under the scope of the project, on the following points are worked on; </span></p>
<ul>
<li>
<div class="&quot;MsoNormal&quot;">Ankara (Ahiboz) LV-129 BOTAŞ Line-Gölbaşı Ø900mm 20 km. Hign Pressure Pipe Line,</div>
</li>
<li>
<div class="&quot;MsoNormal&quot;">Gölbaşı 600.000 m3/h A-RMS Station,</div>
</li>
<li>
<div class="&quot;MsoNormal&quot;">Gölbaşı-İncek Ø700 mm 7 Km. Pipe Line,</div>
</li>
<li>
<div class="&quot;MsoNormal&quot;">Gölbaşı-Doğukent Ø800mm 8 Km. Ø600mm 19Km. Pipe Line,</div>
</li>
<li>
<div class="&quot;MsoNormal&quot;">Doğukent 250.000 m3/h B-RMS Station,</div>
</li>
<li>
<div class="&quot;MsoNormal&quot;">Doğukent-Pursaklar Ø600mm 32 Km. Pipe Line,</div>
</li>
<li>
<div class="&quot;MsoNormal&quot;">Pursaklar 250.000 m3/h B-RMS Station.</div>
</li>
</ul>
<p class="&quot;MsoNormal&quot;"><span lang="&quot;EN-US&quot;"> </span></p>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>NUH CEMENT &#8211; Power Plant Naturalgas Piping Design Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/nuh-cement-power-plant-naturalgas-piping-design-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:24 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/nuh-cement-power-plant-naturalgas-piping-design-project/</guid>

					<description><![CDATA[  Place KOCAELİ / TURKEY Customer NUH CEMENT Services Construction Supervision ServicesConsultancy Services Design Type Basic Design, Detail Design Contract Date 16.03.1999 Completion Date 23.09.1999 Information About the Project The Project covers consultancy and construction supervision services of the piping and construction Works of the pressure reducing stations of the Gas Lines (10000m3 capacity, Type [&#8230;]]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>KOCAELİ / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>NUH CEMENT</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Construction Supervision Services<br />Consultancy Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>16.03.1999</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>23.09.1999</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>
<p class=&quot;MsoNormal&quot;><span lang=&quot;TR&quot;>The Project covers consultancy and construction supervision services of the piping and construction Works of the pressure reducing stations of the Gas Lines (10000m3 capacity, Type A) located in  Nuh Cement &#8211; Power Plant (38MW). <!--?xml:namespace prefix = &quot;o&quot; ns = &quot;urn:schemas-microsoft-com:office:office&quot; /--></span></p>
</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
