<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Tobacco and Cigarette &#8211; Prokon Engineering and Consulting Inc.</title>
	<atom:link href="https://www.prokon.com.tr/en/pc/tobacco-and-cigarette/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.prokon.com.tr</link>
	<description></description>
	<lastBuildDate>Wed, 14 Sep 2022 19:54:10 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>
	<item>
		<title>Philip Morris Sabancı General Directorate And Distribution Building</title>
		<link>https://www.prokon.com.tr/en/portfolio/philip-morris-sabanci-general-directorate-and-distribution-building/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:19 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/philip-morris-sabanci-general-directorate-and-distribution-building/</guid>

					<description><![CDATA[  Place İSTANBUL / TURKEY Customer PHILIP MORRIS SABANCI Services Construction Supervision ServicesMulti &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)Consultancy Services Design Type Basic Design, Detail Design Contract Date 01.07.2002 Completion Date 15.01.2003 Project Manager   Cooperated Firms   Information About the Project The project covers multi discipline basic and detail [&#8230;]]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>İSTANBUL / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>PHILIP MORRIS SABANCI</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Construction Supervision Services<br />Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)<br />Consultancy Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>01.07.2002</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>15.01.2003</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Project Manager</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Cooperated Firms</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>
<p>The project covers multi discipline basic and detail design services and construction management and site supervision services for Directorate General Buildings of PHILSA in İstanbul during construction period.</p>
<p>The total closed area of the buildings is 14.750 m2.</p>
<p>The building has composed of closed parking area, offices and warehouses.</p>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>AKHİSAR Tobacco Store Building</title>
		<link>https://www.prokon.com.tr/en/portfolio/akhisar-tobacco-store-building/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:19 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/akhisar-tobacco-store-building/</guid>

					<description><![CDATA[Place MANiSA / TURKEY Customer SPIERER TOBACCO EXPORT IND. INC. Services Engineering Services Design Type Basic Design, Detail Design Contract Date 15.12.1999 Completion Date 30.04.2000 Project Manager Cooperated Firms Information About the Project The project covers multi discipline basic and detail design services and construction management and site supervision services during construction period.]]></description>
										<content:encoded><![CDATA[<table border="&quot;0&quot;" width="&quot;96%&quot;" cellspacing="&quot;1&quot;" cellpadding="&quot;1&quot;">
<tbody>
<tr>
<td class="&quot;t-ra&quot;">Place</td>
<td>MANiSA / TURKEY</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Customer</td>
<td>SPIERER TOBACCO EXPORT IND. INC.</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Services</td>
<td>Engineering Services</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Contract Date</td>
<td colspan="&quot;3&quot;">15.12.1999</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Completion Date</td>
<td colspan="&quot;3&quot;">30.04.2000</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Project Manager</td>
<td colspan="&quot;3&quot;"></td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Cooperated Firms</td>
<td colspan="&quot;3&quot;"></td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Information About the Project</td>
<td colspan="&quot;3&quot;">The project covers multi discipline basic and detail design services and construction management and site supervision services during construction period.</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>SPIERER &#8211; TOBACCO STORE AND ADMINISTRATION BUILDING MODIFICATION</title>
		<link>https://www.prokon.com.tr/en/portfolio/spierer-tobacco-store-and-administration-building-modification/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:19 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/spierer-tobacco-store-and-administration-building-modification/</guid>

					<description><![CDATA[  Place İZMİR / TURKEY Customer SPIERER TOBACCO EXPORT IND. INC. Services Construction Supervision ServicesMulti &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)Consulting and Site Supervision Design Type Basic Design, Detail Design Contract Date 07.04.1999 Completion Date 06.05.1999 Information About the Project The project covers multi discipline basic and detail design services [&#8230;]]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>İZMİR / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>SPIERER TOBACCO EXPORT IND. INC.</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Construction Supervision Services<br />Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)<br />Consulting and Site Supervision</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>07.04.1999</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>06.05.1999</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers multi discipline basic and detail design services and construction management and site supervision services for tobacco storage and administration building having 10.000 m2 closed area.</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Pmsa İstanbul Güneşli Dc. Surveying And Reinforcement Project For Earthquake Safety</title>
		<link>https://www.prokon.com.tr/en/portfolio/pmsa-istanbul-gunesli-dc-surveying-and-reinforcement-project-for-earthquake-safety/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:14 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/pmsa-istanbul-gunesli-dc-surveying-and-reinforcement-project-for-earthquake-safety/</guid>

					<description><![CDATA[  Place İSTANBUL / TURKEY Customer PHILIP MORRIS SABANCI PAZARLAMA VE SATIS A.S. Services Consultancy ServicesReinforced Concrete Design Design Type Detail Design Contract Date 01.02.2005 Completion Date 28.05.2005 Information About the Project The project covers detail design services in reinforced concrete discipline and technical support during construction period.  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>İSTANBUL / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>PHILIP MORRIS SABANCI PAZARLAMA VE SATIS A.S.</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Consultancy Services<br />Reinforced Concrete Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>01.02.2005</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>28.05.2005</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers detail design services in reinforced concrete discipline and technical support during construction period.</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>PHILSA &#8211; Diyarbakır Regional Directorships Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/philsa-diyarbakir-regional-directorships-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:14 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/philsa-diyarbakir-regional-directorships-project/</guid>

					<description><![CDATA[  Place DİYARBAKIR / TURKEY Customer PHILIP MORRIS SABANCI Services Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)Construction Management Design Type Basic Design, Detail Design Contract Date 04.03.2004 Completion Date 02.02.2005 Information About the Project The project covers multi discipline basic and detail design and construction management during construction phase.  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>DİYARBAKIR / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>PHILIP MORRIS SABANCI</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)<br />Construction Management</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>04.03.2004</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>02.02.2005</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers multi discipline basic and detail design and construction management during construction phase.</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tobacco Facilities Extension Projectphase II Chiller Projects</title>
		<link>https://www.prokon.com.tr/en/portfolio/tobacco-facilities-extension-projectphase-ii-chiller-projects/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:14 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/tobacco-facilities-extension-projectphase-ii-chiller-projects/</guid>

					<description><![CDATA[  Place IZMIR / TURKEY Customer PHILSA PHILIP MORRIS SABANCI SIGARA VE TUTUNCULUK SAN.VE TIC.A.S. Services Construction Supervision ServicesConsultancy ServicesMulti &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services) Design Type Basic Design, Detail Design Contract Date 13.10.2003 Completion Date 30.09.2004  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>IZMIR / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>PHILSA PHILIP MORRIS SABANCI SIGARA VE TUTUNCULUK SAN.VE TIC.A.S.</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Construction Supervision Services<br />Consultancy Services<br />Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>13.10.2003</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>30.09.2004</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tobacco Plant Development Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/tobacco-plant-development-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:14 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/tobacco-plant-development-project/</guid>

					<description><![CDATA[  Place İZMİR / TURKEY Customer PHILSA PHILIP MORRIS SABANCI Services Construction Supervision ServicesMulti &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)Consultancy Services Design Type Basic Design, Detail Design Contract Date 01.10.2003 Completion Date 31.01.2004 Project Manager   Cooperated Firms   Information About the Project The project covers multi discipline basic and [&#8230;]]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>İZMİR / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>PHILSA PHILIP MORRIS SABANCI</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Construction Supervision Services<br />Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)<br />Consultancy Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>01.10.2003</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>31.01.2004</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Project Manager</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Cooperated Firms</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers multi discipline basic and detail design services and construction management and site supervision services during construction period.</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tire Tobacco Facilities Secondary Extention</title>
		<link>https://www.prokon.com.tr/en/portfolio/tire-tobacco-facilities-secondary-extention/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:13 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/tire-tobacco-facilities-secondary-extention/</guid>

					<description><![CDATA[  Place IZMIR / TURKEY Customer BRITISH AMERICAN TOBACCO Services Engineering Services Design Type Basic Design, Detail Design Contract Date 24.05.2005 Completion Date 31.10.2005 Information About the Project The project covers multi discipline basic design and detail design services.  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>IZMIR / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>BRITISH AMERICAN TOBACCO</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Engineering Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>24.05.2005</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>31.10.2005</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers multi discipline basic design and detail design services.</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Philip Morris Sabancı İzmir Dc Renovation Project Preparation Of Tender Documents And Consultancy Services</title>
		<link>https://www.prokon.com.tr/en/portfolio/philip-morris-sabanci-izmir-dc-renovation-project-preparation-of-tender-documents-and-consultancy-services/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:13 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/philip-morris-sabanci-izmir-dc-renovation-project-preparation-of-tender-documents-and-consultancy-services/</guid>

					<description><![CDATA[  Place İZMİR / TURKEY Customer PHILIP MORRIS SABANCI Services Construction Supervision ServicesConsulting and Site SupervisionReinforced Concrete Design Design Type Detail Design Contract Date 14.03.2005 Completion Date 02.03.2006 Information About the Project The project covers detail design services in architectural and mechanical equipment disciplines and construction management and site supervision during construction period.  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>İZMİR / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>PHILIP MORRIS SABANCI</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Construction Supervision Services<br />Consulting and Site Supervision<br />Reinforced Concrete Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>14.03.2005</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>02.03.2006</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers detail design services in architectural and mechanical equipment disciplines and construction management and site supervision during construction period.</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>TF-3 Extension Project &#038; Secondary Production Area Rearrengement</title>
		<link>https://www.prokon.com.tr/en/portfolio/tf-3-expansion-project-secondary-production-area-rearrengement/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:13 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/tf-3-expansion-project-secondary-production-area-rearrengement/</guid>

					<description><![CDATA[Place İzmir/TURKEY Customer Philsa Philip Morris Sabancı Services Construction Management, Consultancy Services, Construction Supervision Services Contract Date 01.04.2015 Completion Date 01.04.2016 Information About the Project Philsa Philip Morris Sabancı TF-3 Production Area Extension Project, Secondary Production Area Project and TF-2 Climatization Floor Construction Project Management Services are provided by PROKON. Project Management Services are listed [&#8230;]]]></description>
										<content:encoded><![CDATA[<table width="&quot;931&quot;">
<tbody>
<tr>
<td width="&quot;217&quot;"><strong>Place</strong></td>
<td width="&quot;680&quot;">İzmir/TURKEY</td>
</tr>
<tr>
<td width="&quot;217&quot;"><strong>Customer</strong></td>
<td width="&quot;680&quot;">Philsa Philip Morris Sabancı</td>
</tr>
<tr>
<td width="&quot;217&quot;"><strong>Services</strong></td>
<td width="&quot;680&quot;">Construction Management, Consultancy Services, Construction Supervision Services</td>
</tr>
<tr>
<td width="&quot;217&quot;"><strong>Contract Date</strong></td>
<td width="&quot;680&quot;">01.04.2015</td>
</tr>
<tr>
<td width="&quot;217&quot;"><strong>Completion Date</strong></td>
<td width="&quot;680&quot;">01.04.2016</td>
</tr>
<tr>
<td width="&quot;217&quot;"><strong>Information About the Project</strong></td>
<td width="&quot;680&quot;">Philsa Philip Morris Sabancı TF-3 Production Area Extension Project, Secondary Production Area Project and TF-2 Climatization Floor Construction Project Management Services are provided by PROKON.</p>
<p>Project Management Services are listed below;</p>
<ul>
<li>TF-3 Production Area Extension Project</li>
<li>Design of the area used by Philsa as a Primary DCC (Direct Conditioning Cylinders) area according to the requirements of the Secondary Production area,</li>
<li>Control of the productions of the TF-2 Air Conditioning Area Project and the completion of the procedure at the end of the work.</li>
</ul>
<p>The following services are also provided for the project;</p>
<ul>
<li>Coordination between Philsa Engineering Department, Project Designer, Contractors and Building Audit Company</li>
<li>Providing necessary informations to selected contractors, following Philsa’s Work Permission Procedures</li>
<li>Determination of acceptance criterias for tests and reports, preparation of procedures, recording test results</li>
<li>Responding all questions from contractors</li>
<li>Cost control and change management system</li>
<li>Work schedule follow-up</li>
<li>Preparation of monthly site reports and construction pictures obtain</li>
<li>Follow up and Coordination of official transactions</li>
<li>Preparation of specifications for out-of-scope works if demanded</li>
<li>Completing the substantial completion date procedure</li>
<li>Control and approval of as-built projects prepared by contractors</li>
</ul>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
