<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Transportation &#8211; Prokon Engineering and Consulting Inc.</title>
	<atom:link href="https://www.prokon.com.tr/en/pc/transportation/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.prokon.com.tr</link>
	<description></description>
	<lastBuildDate>Wed, 14 Sep 2022 20:05:42 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>Ankara Metro 3rd Phase Kızılay-Söğütözü Metro Line Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/ankara-metro-3rd-phase-kizilay-sogutozu-metro-line-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:42 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/ankara-metro-3rd-phase-kizilay-sogutozu-metro-line-project/</guid>

					<description><![CDATA[Place ANKARA / TURKEY Customer ANKARA METROPOLITAN MUNICIPALITY GENERAL DIRECTORATE OF EGO Services Construction Supervision Services Service Starting 16.05.2003 Completion 10.02.2007 Cooperated Firms OPTIM OBERMEYER Information About the Project PROKON provided consultancy and supervision services for Ankara Metro 3rd Stage Project. This project connects 15,36 km long Batıkent-Sincan Stations and 3,11 km long Kızılay-Söğütözü Stations. Double-track [&#8230;]]]></description>
										<content:encoded><![CDATA[<table border="&quot;0&quot;" width="&quot;96%&quot;" cellspacing="&quot;1&quot;" cellpadding="&quot;1&quot;">
<tbody>
<tr>
<td class="&quot;t-ra&quot;">Place</td>
<td>ANKARA / TURKEY</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Customer</td>
<td>ANKARA METROPOLITAN MUNICIPALITY GENERAL DIRECTORATE OF EGO</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Services</td>
<td>Construction Supervision Services</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Service Starting</td>
<td colspan="&quot;3&quot;">16.05.2003</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Completion</td>
<td colspan="&quot;3&quot;">10.02.2007</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Cooperated Firms</td>
<td colspan="&quot;3&quot;">OPTIM<br />
OBERMEYER</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Information About the Project</td>
<td colspan="&quot;3&quot;">PROKON provided consultancy and supervision services for Ankara Metro 3<sup>rd</sup> Stage Project. This project connects 15,36 km long Batıkent-Sincan Stations and 3,11 km long Kızılay-Söğütözü Stations. Double-track rail system is constructed together with 5 pieces level crossing, 2 pieces viaduct, 2 pieces buried and 3 pieces deep buried stations. The route is built with different types of line structures; 6,84 km. long cut&amp;cover line, 1,63 km long cutting, 1,82 km long level crossing, 0,62 km long elevated, 4,12 km long tunnel, 2,03 km long viaduct and 1,68 km long station line. The tunnels were performed with cut&amp;cover and TBM Tunneling system.  <!--?xml:namespace prefix = &quot;o&quot; ns = &quot;urn:schemas-microsoft-com:office:office&quot; /--></p>
<p class="&quot;MsoNormal&quot;">Properties of the system is as follows:</p>
<p class="&quot;MsoListParagraphCxSpFirst&quot;">·         Average Distance between stations:1255 m</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Average speed: 40 km/hour</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Maximum speed: 80 km/hour</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Daily operation time: 18 hours</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Minimum time between the trains: 90 seconds</p>
<p class="&quot;MsoListParagraphCxSpLast&quot;">·         Batıkent-Sincan Circulation time: 22 minutes</p>
<p class="&quot;MsoNormal&quot;">Services within the scope of the project are listed below;</p>
<p class="&quot;MsoListParagraphCxSpFirst&quot;">&#8211;          Design Services:</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Topographic and geologic surveys</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Route plan profile</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Infrastructure fixing drawings</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Preliminary, detail and application drawings of two station structures and Bored tunnels and Cut&amp;Cover Structures</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Storage field and Warehouse Building preliminary and detail drawings</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Preparation of necessary documents for Tender Approval</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         To update all metro lines;</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Update of existing trip estimates</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Update of operation scenarios for  the whole system</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Determination of the fleet based on trip estimates and queue frequency</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Project coordination, revision and approval</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Architectural and Landscaping</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Mechanical works (Heating, Ventilation, Air-Conditioning, plumbing &amp; firefighting)</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Electrical works (Power, Lighting, Grounding)</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">&#8211;          Supervision Services</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Contract Management</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Quality Control / Quality Assurance</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Cost control, change management instructions</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Planning and Program Control</p>
<p class="&quot;MsoListParagraphCxSpLast&quot;">·         Occupational Health and Safety</p>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ankara Metro 1st Phase Aşti &#8211; Çayyolu Metro Line Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/ankara-metro-1st-phase-asti-cayyolu-metro-line-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:42 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/ankara-metro-1st-phase-asti-cayyolu-metro-line-project/</guid>

					<description><![CDATA[Place ANKARA / TURKEY Customer ANKARA METROPOLITAN MUNICIPALITY GENERAL DIRECTORATE OF EGO Services Construction Supervision Services Consultancy Services Service Starting 17.09.2002 Completion 14.06.2007 Cooperated Firms OPTIM OBERMAYER Information About the Project PROKON provided consultancy and supervision services for 1st Phase AŞTI-Çayyolu Metro Line Project. Ankara Metro, 1st Phase AŞTI-Çayyolu Rail Transport System connects AŞTİ and Köy [&#8230;]]]></description>
										<content:encoded><![CDATA[<table border="&quot;0&quot;" width="&quot;96%&quot;" cellspacing="&quot;1&quot;" cellpadding="&quot;1&quot;">
<tbody>
<tr>
<td class="&quot;t-ra&quot;">Place</td>
<td>ANKARA / TURKEY</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Customer</td>
<td>ANKARA METROPOLITAN MUNICIPALITY GENERAL DIRECTORATE OF EGO</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Services</td>
<td>Construction Supervision Services<br />
Consultancy Services</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Service Starting</td>
<td colspan="&quot;3&quot;">17.09.2002</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Completion</td>
<td colspan="&quot;3&quot;">14.06.2007</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Cooperated Firms</td>
<td colspan="&quot;3&quot;">OPTIM<br />
OBERMAYER</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Information About the Project</td>
<td colspan="&quot;3&quot;">
<p class="&quot;MsoNormal&quot;">PROKON provided consultancy and supervision services for 1st Phase AŞTI-Çayyolu Metro Line Project. <!--?xml:namespace prefix = &quot;o&quot; ns = &quot;urn:schemas-microsoft-com:office:office&quot; /--></p>
<p class="&quot;MsoNormal&quot;">Ankara Metro, 1st Phase AŞTI-Çayyolu Rail Transport System connects AŞTİ and Köy Hizmetleri Stations with a 5575 m long line and  Köy Hizmetleri and Ümitköy Stations with 3815 m long line. The double-track railway line was constructed together with 7 underground stations. The lane was constructed in different type of track ways; 0,140 km long At-Grade line, 0,070 km long Cut Line, 5,955 km long Cut&amp;Cover Line, 1,945 km long Tunnel, 1,28 km long 7 station lines. The tunnels have been constructed in Cut&amp;Cover and TBM Tunneling Methods.  The total closed area of 7 underground stations is 55.000 m<sup>2</sup>.</p>
<p class="&quot;MsoNormal&quot;">Services within the scope of the project are listed below;</p>
<p class="&quot;MsoListParagraphCxSpFirst&quot;">&#8211;          Design Services:</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Preparation of Updated Feasibility Report</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Preparation of Final Design of Trackways</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Coordination, review and approval of</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Architectural and Landscaping ,</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Reinforced Concrete Bearing System</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Mechanical Works (Heating, Ventilating,   AC, plumbing &amp; fire fighting system)</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Electrical Works (Power, Lighting, Grounding)</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">&#8211;          Construction Management</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Contract Management</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Quality Control / Quality Assurance</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Cost Control , management of change orders</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Planning and program control</p>
<p class="&quot;MsoListParagraphCxSpLast&quot;">·         Occupational Health and Safety</p>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>AIRBUS A 380 Hangars Structural Steel Works</title>
		<link>https://www.prokon.com.tr/en/portfolio/airbus-a-380-hangars-structural-steel-works/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:42 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/airbus-a-380-hangars-structural-steel-works/</guid>

					<description><![CDATA[Place DUBAI / UNITED ARAB EMIRATES Customer TAV CONSTRUCTION &#8211; DUBAI Services Engineering Services Consultancy Services Design Type Basic Design, Detail Design Contract Date 01.09.2003 Completion Date 30.07.2004 Information About the Project The Engineering Services of Airbus A 380 Hangar Project were provided by PROKON under the scope of the contract between TAV and Emirates [&#8230;]]]></description>
										<content:encoded><![CDATA[<table border="&quot;0&quot;" width="&quot;96%&quot;" cellspacing="&quot;1&quot;" cellpadding="&quot;1&quot;">
<tbody>
<tr>
<td class="&quot;t-ra&quot;">Place</td>
<td>DUBAI / UNITED ARAB EMIRATES</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Customer</td>
<td>TAV CONSTRUCTION &#8211; DUBAI</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Services</td>
<td>Engineering Services<br />
Consultancy Services</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Contract Date</td>
<td colspan="&quot;3&quot;">01.09.2003</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Completion Date</td>
<td colspan="&quot;3&quot;">30.07.2004</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Information About the Project</td>
<td colspan="&quot;3&quot;">The Engineering Services of Airbus A 380 Hangar Project were provided by PROKON under the scope of the contract between TAV and Emirates Airlines. The project covers Basic and Detail Design of the steel roof for the Maintenance Hangars of the World’s Largest Passenger Aircraft A 380, designed by Airbus. Project covers the design and erection engineering of 7 Maintenance Hangars (108m x 100m x 30m).</p>
<p>The points makes the project different from other ordinary designs are;</p>
<ul>
<li>Being composed of 7000 bar elements and 800 different load combinations,</li>
<li>Mounting difficulties due to the extreme temperature differences in manufacture and erection sites,</li>
<li>The use of HISTAR steel with very high strength.</li>
<li>Thousands of loads, each calculated according to the 800 different load combinations,</li>
<li>All nodes being &#8220;Slip Critical &#8211; Friction Grip&#8221;, Detailed Erection Engineering Service which may be the first in Turkey,</li>
<li>Preparation of special video showing the practicability of erection works,</li>
<li>Giving a reverse deflection to a truss having 108m opening (Mega Truss) and Preparation of the Shop Drawings accordingly, Preparation of Specific Engineering Calculations for the truss having four-story building height starting from pre-erection works to the Final Erection Stage,</li>
<li>Extraordinary and specific solution of lifting and placement problems of an arch having 108 m opening (Facade Arch) which was complicated as a bridge itself,</li>
<li>Considering the scenario of the cracking of the concrete over time which lies under the hangars,</li>
<li>Transportation problems and occurring of difficult &#8220;brand&#8221; geometries due to the geometry of the structure.</li>
</ul>
<p>Each Hangars, weighing approximately 1800 tons, (including the Erection Engineering) were performed by the COMOSYS software that was developed by PROYA Yazılım ve Ticaret A.Ş., a member of PROKON-EKON Group of Companies.</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>TURKISH WAGON INDUSTRY &#8211; 12. Hall (PREPARING Hall) Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/turkish-wagon-industry-12-hall-preparing-hall-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:26 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/turkish-wagon-industry-12-hall-preparing-hall-project/</guid>

					<description><![CDATA[  Place ADAPAZARI / TURKEY Customer TURKISH WAGON INDUSTRY CO. Services Consultancy Services Design Type Basic Design, Detail Design Contract Date 07.05.2004 Completion Date 02.08.2004 Project Manager   Cooperated Firms   Information About the Project The project covers multi discipline basic design and detail design services.  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>ADAPAZARI / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>TURKISH WAGON INDUSTRY CO.</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Consultancy Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Basic Design, Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>07.05.2004</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>02.08.2004</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Project Manager</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Cooperated Firms</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers multi discipline basic design and detail design services.</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ANKARA Metro 3rd Phase Batıkent &#8211; Sincan (TÖREKENT) Metro Line Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/ankara-metro-3rd-phase-batikent-sincan-torekent-metro-line-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:26 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/ankara-metro-3rd-phase-batikent-sincan-torekent-metro-line-project/</guid>

					<description><![CDATA[&#160; Place ANKARA / TURKEY Customer ANKARA METROPOLITAN MUNICIPALITY GENERAL DIRECTORATE OF EGO Services Construction Supervision Services Consultancy Services Design Type Detail Design Contract Date 06.07.2001 Completion Date Project Manager Cooperated Firms Information About the Project PROKON provided consultancy and supervision services for Ankara Metro 3rd Stage Project. This project connects 15,36 km long Batıkent-Sincan Stations [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>&nbsp;</p>
<table border="&quot;0&quot;" width="&quot;96%&quot;" cellspacing="&quot;1&quot;" cellpadding="&quot;1&quot;">
<tbody>
<tr>
<td class="&quot;t-ra&quot;">Place</td>
<td>ANKARA / TURKEY</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Customer</td>
<td>ANKARA METROPOLITAN MUNICIPALITY GENERAL DIRECTORATE OF EGO</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Services</td>
<td>Construction Supervision Services<br />
Consultancy Services</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Design Type</td>
<td>Detail Design</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Contract Date</td>
<td colspan="&quot;3&quot;">06.07.2001</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Completion Date</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Project Manager</td>
<td colspan="&quot;3&quot;"></td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Cooperated Firms</td>
<td colspan="&quot;3&quot;"></td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Information About the Project</td>
<td colspan="&quot;3&quot;">
<p class="&quot;MsoNormal&quot;">PROKON provided consultancy and supervision services for Ankara Metro 3<sup>rd</sup> Stage Project. This project connects 15,36 km long Batıkent-Sincan Stations and 3,11 km long Kızılay-Söğütözü Stations. Double-track rail system is constructed together with 5 pieces level crossing, 2 pieces viaduct, 2 pieces buried and 3 pieces deep buried stations. The route is built with different types of line structures; 6,84 km. long cut&amp;cover line, 1,63 km long cutting, 1,82 km long level crossing, 0,62 km long elevated, 4,12 km long tunnel, 2,03 km long viaduct and 1,68 km long station line. The tunnels were performed with cut&amp;cover and TBM Tunneling system.  <!--?xml:namespace prefix = &quot;o&quot; ns = &quot;urn:schemas-microsoft-com:office:office&quot; /--></p>
<p class="&quot;MsoNormal&quot;">Properties of the system is as follows:</p>
<p class="&quot;MsoListParagraphCxSpFirst&quot;">·         Average Distance between stations:1255 m</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Average speed: 40 km/hour</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Maximum speed: 80 km/hour</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Daily operation time: 18 hours</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Minimum time between the trains: 90 seconds</p>
<p class="&quot;MsoListParagraphCxSpLast&quot;">·         Batıkent-Sincan Circulation time: 22 minutes</p>
<p class="&quot;MsoNormal&quot;">Services within the scope of the project are listed below;</p>
<p class="&quot;MsoListParagraphCxSpFirst&quot;">&#8211;          Design Services:</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Topographic and geologic surveys</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Route plan profile</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Infrastructure fixing drawings</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Preliminary, detail and application drawings of two station structures and Bored tunnels and Cut&amp;Cover Structures</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Storage field and Warehouse Building preliminary and detail drawings</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Preparation of necessary documents for Tender Approval</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         To update all metro lines;</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Update of existing trip estimates</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Update of operation scenarios for  the whole system</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Determination of the fleet based on trip estimates and queue frequency</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Project coordination, revision and approval</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Architectural and Landscaping</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Mechanical works (Heating, Ventilation, Air-Conditioning, plumbing &amp; firefighting)</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">o    Electrical works (Power, Lighting, Grounding)</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">&#8211;          Supervision Services</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Contract Management</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Quality Control / Quality Assurance</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Cost control, change management instructions</p>
<p class="&quot;MsoListParagraphCxSpMiddle&quot;">·         Planning and Program Control</p>
<p class="&quot;MsoListParagraphCxSpLast&quot;">·         Occupational Health and Safety</p>
</td>
</tr>
</tbody>
</table>

<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-1-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img fetchpriority="high" decoding="async" width="300" height="225" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-1--300x225.jpg" class="attachment-medium size-medium" alt="" /></a>
<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-2-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img decoding="async" width="300" height="225" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-2--300x225.jpg" class="attachment-medium size-medium" alt="" /></a>
<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-3-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img decoding="async" width="300" height="225" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-3--300x225.jpg" class="attachment-medium size-medium" alt="" /></a>
<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-4-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="300" height="225" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-4--300x225.jpg" class="attachment-medium size-medium" alt="" /></a>
<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-5-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-1"><img loading="lazy" decoding="async" width="300" height="225" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/598_prokon_ankara_metro_hatti_line_batikent_sincan_musavirlik_consultancy-5--300x225.jpg" class="attachment-medium size-medium" alt="" /></a>

]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>TURKISH WAGON INDUSTRY &#8211; New Production Hall</title>
		<link>https://www.prokon.com.tr/en/portfolio/turkish-wagon-industry-new-production-hall/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:26 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/turkish-wagon-industry-new-production-hall/</guid>

					<description><![CDATA[  Place ADAPAZARI / TURKEY Customer TURKISH WAGON INDUSTRY CO. Services Engineering Services Design Type Detail Design Contract Date 09.04.2001 Completion Date 28.09.2001 Project Manager   Cooperated Firms   Information About the Project The project covers detail design services in architectural, reinforced concrete and steel disciplines.  ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>ADAPAZARI / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>TURKISH WAGON INDUSTRY CO.</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Engineering Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>09.04.2001</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>28.09.2001</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Project Manager</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Cooperated Firms</td>
<td colspan=&quot;3&quot;> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>The project covers detail design services in architectural, reinforced concrete and steel disciplines.</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>BURSA Light Rail System Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/bursa-light-rail-system-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:26 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/bursa-light-rail-system-project/</guid>

					<description><![CDATA[  Place BURSA / TURKEY Customer BURSA METROPOLITAN MUNICIPALITY Services Construction Supervision Services Design Type   Contract Date 10.03.1999 Completion Date 30.06.2000 Information About the Project The scope of the work is to perform the infrastructure, civil, architectural and mechanical design works of the fields and units for the Light Rail System Operation and Maintenance [&#8230;]]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>BURSA / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>BURSA METROPOLITAN MUNICIPALITY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Construction Supervision Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td> </td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>10.03.1999</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>30.06.2000</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>
<p>The scope of the work is to perform the infrastructure, civil, architectural and mechanical design works of the fields and units for the Light Rail System Operation and Maintenance Services to be performed.</p>
<p>The following units were designed by PROKON under the scope of the project:</p>
<p> </p>
<ul>
<li>Operation and Maintenance Center (approximately 240.000 m2 area);</li>
</ul>
<p>&#8211; General Facility Settlement Plan,</p>
<p>&#8211; Site storm water drainage system,</p>
<p>&#8211; Sewer system,</p>
<p>&#8211; Utility water system,</p>
<p>&#8211; Site Fire Hydrant system,</p>
<p>&#8211; Pressurized air installation system,</p>
<p>&#8211; Protection walls, platforms, electricity and installation canals,</p>
<p>&#8211; Natural gas pipe line drawings</p>
<p> </p>
<ul>
<li>Maintenance and Repair Warehouse</li>
<li>Administration building,</li>
<li>Paint warehouse,</li>
<li>Heating center,</li>
<li>Transformer building</li>
<li>Security Building,</li>
<li>Vehicle washing Unit</li>
</ul>
</td>
</tr>
</tbody>
</table>
<p> </p>

<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/509_prokon_bursa_light_rail_system_hafif_rayli_sistem_muhendislik_engineering-1-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="300" height="199" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/509_prokon_bursa_light_rail_system_hafif_rayli_sistem_muhendislik_engineering-1--300x199.jpg" class="attachment-medium size-medium" alt="" /></a>
<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/509_prokon_bursa_light_rail_system_hafif_rayli_sistem_muhendislik_engineering-2-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="300" height="200" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/509_prokon_bursa_light_rail_system_hafif_rayli_sistem_muhendislik_engineering-2--300x200.jpg" class="attachment-medium size-medium" alt="" /></a>
<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/509_prokon_bursa_light_rail_system_hafif_rayli_sistem_muhendislik_engineering-3-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="300" height="253" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/509_prokon_bursa_light_rail_system_hafif_rayli_sistem_muhendislik_engineering-3--300x253.jpg" class="attachment-medium size-medium" alt="" /></a>
<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/509_prokon_bursa_light_rail_system_hafif_rayli_sistem_muhendislik_engineering-4-.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-2"><img loading="lazy" decoding="async" width="300" height="220" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/509_prokon_bursa_light_rail_system_hafif_rayli_sistem_muhendislik_engineering-4--300x220.jpg" class="attachment-medium size-medium" alt="" /></a>

]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>İSTANBUL Metro Unkapanı &#8211; Taksim Metro Line Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/istanbul-metro-unkapani-taksim-metro-line-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:26 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/istanbul-metro-unkapani-taksim-metro-line-project/</guid>

					<description><![CDATA[  Place İSTANBUL / TURKEY Customer İSTANBUL METROPOLITAN MUNICIPALITY Services Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services) Design Type Detail Design Contract Date 27.01.1999 Completion Date 14.01.2001 Information About the Project    ]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>İSTANBUL / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>İSTANBUL METROPOLITAN MUNICIPALITY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>27.01.1999</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Completion Date</td>
<td colspan=&quot;3&quot;>14.01.2001</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>
<p> </p>
</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>KARTAL KAYNARCA Metro Line Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/kartal-kaynarca-metro-line-project-1/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:25 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/kartal-kaynarca-metro-line-project-1/</guid>

					<description><![CDATA[  Place İSTANBUL / TURKEY Customer İSTANBUL METROPOLITAN MUNICIPALITY Services Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)Consultancy ServicesConstruction Supervision Services Design Type Detail Design Contract Date 03.05.2013 Cooperated Firms OPTIM OBERMEYER Information About the Project The Project covers 4,2 km length 2 metro tunnel, 3 station and pedestrian connection tunnels [&#8230;]]]></description>
										<content:encoded><![CDATA[<p> </p>
<table border=&quot;0&quot; width=&quot;96%&quot; cellspacing=&quot;1&quot; cellpadding=&quot;1&quot;>
<tbody>
<tr>
<td class=&quot;t-ra&quot;>Place</td>
<td>İSTANBUL / TURKEY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Customer</td>
<td>İSTANBUL METROPOLITAN MUNICIPALITY</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Services</td>
<td>Multi &#8211; Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)<br />Consultancy Services<br />Construction Supervision Services</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Design Type</td>
<td>Detail Design</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Contract Date</td>
<td colspan=&quot;3&quot;>03.05.2013</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Cooperated Firms</td>
<td colspan=&quot;3&quot;>OPTIM<br /> OBERMEYER</td>
</tr>
<tr>
<td class=&quot;t-ra&quot;>Information About the Project</td>
<td colspan=&quot;3&quot;>
<ul>
<li>
<div class=&quot;MsoNormal&quot;>The Project covers 4,2 km length 2 metro tunnel, 3 station and pedestrian connection tunnels and other electromechanic work. Also 5 metro station pedestrian access tunnels are included within the scope of the Project.</div>
</li>
<li>
<div class=&quot;MsoNormal&quot;>The Project covers the design review, additional Project Services and consultancy services during the construction period.</div>
</li>
</ul>
</td>
</tr>
</tbody>
</table>
<p> </p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Antalya 1st Stage Light Rail System Project</title>
		<link>https://www.prokon.com.tr/en/portfolio/antalya-1st-stage-light-rail-system-project/</link>
		
		<dc:creator><![CDATA[Prokon Site Yöneticisi]]></dc:creator>
		<pubDate>Sat, 16 Jul 2022 21:38:25 +0000</pubDate>
				<guid isPermaLink="false">https://prokon.sadeceinternet.com/2022/07/17/antalya-1st-stage-light-rail-system-project/</guid>

					<description><![CDATA[Place ANTALYA / TURKEY Customer ANTALYA METROPOLITAN MUNICIPALITY Services Consultancy Services Construction Supervision Services Contract Date 26.12.2006 Completion Date 31.05.2011 Cooperated Firms Optim Obermeyer Teknik Bilgi İşlem Merkezi A.Ş. Information About the Project Light Rail System, lying on Fatih-Bus Station-Square line, has a main line length of 11,5 km. The Project covers the supervision services [&#8230;]]]></description>
										<content:encoded><![CDATA[<table border="&quot;0&quot;" width="&quot;96%&quot;" cellspacing="&quot;1&quot;" cellpadding="&quot;1&quot;">
<tbody>
<tr>
<td class="&quot;t-ra&quot;">Place</td>
<td>ANTALYA / TURKEY</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Customer</td>
<td>ANTALYA METROPOLITAN MUNICIPALITY</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Services</td>
<td>Consultancy Services<br />
Construction Supervision Services</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Contract Date</td>
<td colspan="&quot;3&quot;">26.12.2006</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Completion Date</td>
<td colspan="&quot;3&quot;">31.05.2011</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Cooperated Firms</td>
<td colspan="&quot;3&quot;">Optim Obermeyer Teknik Bilgi İşlem Merkezi A.Ş.</td>
</tr>
<tr>
<td class="&quot;t-ra&quot;">Information About the Project</td>
<td colspan="&quot;3&quot;">Light Rail System, lying on Fatih-Bus Station-Square line, has a main line length of 11,5 km. The Project covers the supervision services of construction and electromechanical works.</p>
<p>PROKON has provided consultancy services for the following works;</p>
<ul>
<li>9,32 Km. Level Crossing Line,</li>
<li>1,63 Km. Cut-Fill Line,</li>
<li>0,15 Km. Underground Station Structure (Bus Station &#8211; Çallı Stations),</li>
<li>0,41 Km. Underground Station Underpass Connection,</li>
<li>0,45 Km. Road Underpass,</li>
<li>0,44 Km. Road Approach Tunnel</li>
<li>Infrastructure Transposition Works</li>
<li>14 Level Crossing Stations,</li>
<li>Warehouse and Storage Field,</li>
<li>Storage Field and Support Buildings,</li>
<li>Transformer Buildings,</li>
<li>Power Supply and Electrification System,</li>
<li>Signaling System,</li>
<li>Communication and Control System,</li>
<li>Supply and Installation of Maintenance Equipment,</li>
<li>Operation and Maintenance Support and Control,</li>
<li>Vehicle Supply (14 units) and Commissioning,</li>
<li>Electromechanical Works Spare Parts (2 Years),</li>
<li>Vehicle Spare Parts (2 Years),</li>
<li>Vehicle Special Equipment</li>
</ul>
<p>PROKON has provided project management and construction supervision within the scope of consultancy services covering the following phases and services;</p>
<p><strong>1st Stage: Pre-Construction Consultancy Services</strong></p>
<ul>
<li>Inspection of the Designs</li>
<li>Inspection of the Construction Works Tender Documents</li>
<li>Technical Support to the Client during the Tender Evaluation Stage</li>
</ul>
<p><strong>2nd Stage: Construction Stage Consultancy Services</strong></p>
<p><strong>Design Review Services</strong></p>
<ul>
<li>Project Coordination, Review and Approval</li>
<li>Architecture and Landscape,</li>
<li>R.C. Support System,</li>
<li>Mechanical Works (Heating, Ventilation, Air-Conditioning, Plumbing &amp; Firefighting)</li>
<li>Electrical Works (Power, Lighting, Grounding)</li>
</ul>
<p><strong>Review of Tender Documents</strong></p>
<p><strong>     Helping the Client during Tender Evaluation Stage</strong></p>
<p><strong>Construction Supervision Services</strong></p>
<ul>
<li>Contract Management</li>
<li>Quality Control / Quality Assurance</li>
<li>Cost Control, Change Management Instructions</li>
<li>Planning and Program Control</li>
<li>Occupational Health and Safety</li>
<li>Preparation of Presentations</li>
</ul>
</td>
</tr>
</tbody>
</table>

<a href='https://www.prokon.com.tr/wp-content/uploads/2022/07/704_prokon_antalya_1inci_1st_light_rail_hafif_rayli_musavirlik_consultancy-1-2.jpg' title="" data-rl_title="" class="rl-gallery-link" data-rl_caption="" data-rel="lightbox-gallery-3"><img loading="lazy" decoding="async" width="300" height="188" src="https://www.prokon.com.tr/wp-content/uploads/2022/07/704_prokon_antalya_1inci_1st_light_rail_hafif_rayli_musavirlik_consultancy-1-2-300x188.jpg" class="attachment-medium size-medium" alt="" /></a>

]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
