Ümraniye Maternity & Pediatric Hospital (CB-1.4/C)

Ümraniye Maternity & Pediatric Hospital (CB-1.4/C)


Project Description
Place İSTANBUL / TURKEY
Customer ISTANBUL SPECIAL PROVINCIAL ADMINISTRATION ISTANBUL PROJECT COORDINATION UNIT – WORLD BANK
Services Multi – Discipline Engineering Services (Architectural, Structural, Electrical, Mechanical, Infrastructural Engineering Services)

Construction Supervision Services

Contract Date 10.02.2009
Completion Date 06.09.2015
Cooperated Firms OBERMEYER PROJE TEKN. BİLGİ İŞLEM MERK. A.Ş.

OBERMEYER Planen&Beraten GmbH

FAUST Consult GmbH

Information About the Project In response to this risk, the Government of Turkey, with the assistance of the International Bank of Reconstruction and Development (IBRD), has identified a project called Istanbul Seismic Risk Mitigation and Emergency Preparedness Project (ISMEP) which is financed by a World Bank Loan (4784 TU). The project is implemented by Istanbul Project Coordination Unit which is established under the Istanbul Special Provincial Administration (ISPA).

The contract covers the Consultancy Services for Design and Construction Supervision of 477 Bed Capacity Ümraniye Pediatric and Maternity Hospital (98.115 m2) complete with the medial equipments, Design of Pendik Vali Cahit Bayar District Polyclinic (Mehmet Oğuz District Polyclinic, 14.939 m2) and Design/Design Review of Küçükyalı Nursery (Typical Design, 4.654 m2) and Kocamustafapaşa Social Center (1857 m2).

The hospital has composed of emergency, polyclinic, imaging center, laboratories, operating rooms, intense care, maternity and pediatric bed units, newborn unit, bone marrow transplantation, hematology-oncology, infectious diseases, general administration units, training and meeting rooms, archive areas, hospital depots, service area, closed car parking area, entrance control buildings and technical center.

PROKON provided the following services under the scope of this project:

Engineering and Design Services

  • Architectural
  • Structural
  • Mechanical Works (HVAC, Fire System, Plumbing, Piping etc.)
  • Electrical Works (Power, Lighting, Grounding, Telephone, Data Lines, Fire Alarm System, Automation etc.)

Tendering File Preparation related with the Construction Contract in accordance with the World Bank (IBRD) Guidelines and Standard Bidding Documents

  • Contract, Scope, Work Plan, Technical Specifications, Estimate and Quantity Survey

Supervision Services

  • Demolition Supervision Services
  • Construction Supervision Services ( Planning, Activity Tracing, Control/ Cost Control, Quality Control, Design Control and Interior Furnishing Plan Preparing, Coordination, Reporting)